Guangdong Heyuan downtown central substation project

PubDate:2019-12-25Author:Sources:Views:13347

The station was successfully completed and put into operation in December 2017, providing large capacity power supply guarantee for many important loads in Heyuan urban area. Zhengchao Electric provides 47 sets of 10kV fixed switchgear for the station. The products have been put into operation so far, with safe and stable performance, large capacity and low temperature rise, and are well received by users.