Guangxi Nanning 110kV Shangqi (Vientiane) power transformation project

PubDate:2019-12-25Author:Sources:Views:13162

The station was successfully completed and put into operation in June 2019, which provides large-capacity power supply guarantee for many important loads. Zhengchao Electric provides the station with 10kV armored shift-type switchgear, a total of 53 sets. Since the operation of the product, the performance is safe, stable, large capacity and low temperature rise, which is well received by users.